Pilot guided Auger Project Wergea
Last week our team completed another successful pilot guided auger drilling.
This project involved drilling an 18-metre culvert (steel ø 273) in Wergea, near Leeuwarden. The culvert was installed to connect waterways in the region and better regulate water levels. This is part of the project “Klimaatrobuuste polders” (climate-proof polders).
