Back to Our projects

Open front drilling Ritthem

Last week we completed in Ritthem a pilot guided auger drilling of 30 meters Ø272 *24mm (Hobas) fully on schedule and to the satisfaction of our client.

A 400-meter high-pressure gas transport pipeline is being constructed around Vlissingen Oost; with our trenchless techniques we ensured that the road and railroad to be crossed remained in accessible during the crossing.

Our equipment has already been removed and is being prepared for the next OFT drilling!