GFT drilling Copenhagen
This morning in Copenhagen we received another drilling, this was the 3rd drilling from the same well with a length of 67 meters (GRP Ø1099).
This was the 5th drilling in a series of 10 for the rainwater sewer to be constructed in the district of Hellerup. Nice work guys, on to drilling 6!
