Back to Our projects

Four pilot guided auger drillings near Bocholtz 

The number of electric cars is rapidly increasing and so is the need for charging points, for instance at petrol stations. In connection with this, last week we carried out 4 pilot guided auger drillings (casing steel jacking pipes ø219) at the Shell gas station on the  highway A76 near Bocholtz Limburg. The lengths of the drillings are 22 and 17 metres. As soon as we have completed our work, cables will be pulled through for the power supply so that these charging stations can quickly be taken into use.