Back to PROJECTS

Four pilot guided auger drillings near Bocholtz

The number of electric cars is rapidly increasing and so is the need for charging points, for instance at petrol stations. In connection with this, last week we carried out 4 pilot guided auger drillings (casing steel jacking pipes ø219) at the Shell gas station on the  highway A76 near Bocholtz Limburg. The lengths of the drillings are 22 and 17 metres. As soon as we have completed our work, cables will be pulled through for the power supply so that these charging stations can quickly be taken into use.

Four pilot guided auger drillings near Bocholtz

See also:

Medewerker aan het woord: Hoofd Materieelbeheer Edwin

Medewerker aan het woord: Hoofd Materieelbeheer Edwin

Iedere 2 maanden staat er iemand uit ons team in de spotlights. Vandaag vertelt ons Hoofd Materieelbeheer Edwin wat hij geweldig vindt om mee bezig te zijn en hoe lang hij precies aan boord is.
 
Open Front boring Lingen (DUI)

Open Front boring Lingen (DUI)

Een foto die de overname van de Open en Gesloten booractiviteiten van Visser & Smit Hanab van ruim 2,5 jaar geleden mooi weer geeft, een oranje en blauwe machine gebroederlijk naast elkaar aan het werk!